Savings from lower first project cost or line loss will result in an accelerated return on conductor investment.
- Up to 20% Reduced Project Costs*
A reduced conductor sag or size enables optimized structures, hardware and labor for new lines. - Up to 25% Increased Ampacity*
Maximizes capacity on new lines and lowers reconductoring cost by increasing conductor ampacity without upgrading existing infrastructure. - Up to 25% Lower Line Loss*
Reduces conductor line losses via lower operating temperature, resulting in significant lifetime savings. - Up to 30% Reduced Operating Temperature*
Lower operating temperature reduces power losses and increases power-carrying capacity, for efficiency and lower total system costs.
*Dependent upon operating conditions